Satisfactory · Game data 1.2.4.0
Path Signal: cost & unlock
Directs the movement of trains to avoid collisions and bottlenecks. Path Signals are advanced signals that are especially useful for bi-directional Railways and complex intersections. They function similarly to Block Signals, but rather than occupying the entire Block, trains can reserve a specific path through it and will only enter the Block if their path allows them to fully pass through. Caution: Signals are directional! Trains are unable to move against this direction, so be sure to set up Signals in both directions for bi-directional Railways.
Build cost
2 × Steel Pipe
1 × Computer
These materials construct one Path Signal. Multiply the cost by the number you intend to place, and reserve those parts separately from your ongoing production demand. Construction costs are a one-time payment, not an input rate per minute.
Unlock
Railway Signalling · HUB · Tier 6
Unlock cost: 50 × Computer
400 × Steel Pipe
1,000 × Copper Sheet
Use the planner to adjust clock speeds, alternate recipes, available resources, power shards and Somersloops. Your calculations and saved factories stay in this browser.